Where Wilkes-Barre's Next Apartments Are Coming From

The former Sacred Heart of Jesus Church at 607 N. Main St. sold for $60,000 in December 2021. The buyer was Nikolin Gjoklaj, a Bronx developer, and in April 2025 he won city zoning approval to turn the church into 16 apartments. The church cost less per unit than a used car. Most of the apartments Wilkes-Barre has approved recently follow the same pattern: an old building bought cheap, then a renovation that costs far more than the building did.

If you're comparing Wilkes-Barre with Scranton, Kingston or the Mid-Valley for a duplex or triplex, this pattern matters more than any single listing price. It tells you who your future competition is and what they will need to charge.

The Pipeline Is Made of Old Buildings

Below are the Wilkes-Barre apartment projects that the Citizens' Voice and the Times Leader have reported on since early 2024. None of them is new construction on open land.

Address Former use Developer or owner Units Status as last reported
607 N. Main St. Sacred Heart of Jesus Church Nikolin Gjoklaj 16 Zoning approved April 2025
190 Matson Ave., Parsons Lot with an existing 12-unit building 190 Matson LLC, Gjoklaj 13 new Approved Feb. 2026
16–22 E. Union St. Phoenix Building apartments Janta Raja LLC 32 Approved Jan. 2026
87 N. Main St. Liberty Cleaners Vito Malacari 10, student-oriented Zoning approved
226 E. Northampton St. Fraternal Order of Eagles club Vito Malacari 8 Approved Feb. 2024
Blackman and High streets Marx Sheet Metal factory Hertzka Jacobowitz 27 Hearing moved to Nov. 18
123 S. Franklin St. Dentist's office Joel Zitofsky 2 Approved June 2026

Each of these projects is small. The largest approved one holds 32 units. A few developers account for several projects apiece: Malacari has the cleaners building and the Eagles club, and Gjoklaj has the church and Parsons. The Citizens' Voice reported in October that the Marx Sheet Metal case was postponed because the zoning board lacked a quorum, and the hearing was moved to Nov. 18. At the large end, Land Ventures got zoning variances in January 2025 for a six-story building at 63 S. Main St. with about 120 apartments over ground-floor retail. The project was estimated at $30 million and still needed planning approvals before construction could start.

The Building Is Cheap. The Renovation Is the Real Cost.

Purchase prices in this pipeline are low. Besides the $60,000 church, 190 Matson LLC paid $105,000 in March 2022 for an existing 12-unit building in Parsons plus a vacant lot across Railroad Street for parking. The two properties now carry a combined assessed value of $359,900.

Renovation costs are not low. The Phoenix Building on East Union Street shows this most clearly. The city condemned the building in April 2025. Janta Raja LLC, its new owner, got approval in November 2025 to bring it to 29 units, then in January 2026 to bring it to 32. Over those same two months, the renovation estimate climbed from $1.2 million to $1.5 million, according to the Times Leader. Spread over 32 units, $1.5 million comes to roughly $47,000 per apartment in renovation alone, before the cost of buying the building.

The Times Leader reported that rents at the Phoenix Building will depend on the final cost of the renovation, not on the purchase price.

Where Those Rents Land

The Phoenix Building gives a concrete number. In January 2026, the Citizens' Voice reported that the proposal called for one- and two-bedroom units renting for $1,200 to $1,500 a month. Note that this range was quoted on the $1.2 million estimate, before costs went up.

Compare that range with HUD's Fair Market Rents for the Scranton–Wilkes-Barre metro, which covers Lackawanna, Luzerne and Wyoming counties:

Unit size FY2026, effective Oct. 1, 2025 FY2027
Studio $863 $949
One bedroom $1,028 $1,106
Two bedroom $1,252 $1,363
Three bedroom $1,631 $1,786

Both schedules are published on HUD's Fair Market Rent page. The metro's two-bedroom figure rose $111 between the FY2026 and FY2027 schedules, about 9%. The Wilkes-Barre Housing Authority's 2026 payment standards are close to the FY2027 numbers: $1,131 for a one-bedroom and $1,377 for a two-bedroom, according to its published schedule.

Put the numbers side by side and the Phoenix Building's proposed $1,200 to $1,500 falls in the same band as the metro's two-bedroom benchmark of $1,252 to $1,363. These are newly renovated apartments proposed at rents close to HUD's figure for an ordinary two-bedroom in the region.

The one earlier downtown example points the same way. The 34-apartment conversion of a former furniture store at 116 S. Main St. was fully leased by December 2023, with rents between $1,300 and $2,100, the Citizens' Voice reported at the time. That shows renovated units in this rent range found tenants downtown. It's a 2023 data point, so it says nothing about lease-up speed today.

Approval Comes Well Before Move-In

For an investor timing a purchase, the more useful number is how long a project takes to deliver apartments after it is approved. After the April 2025 hearing for Sacred Heart, George Albert, the project's architectural and engineering consultant, estimated three to six months of planning and design and then six to eight months of renovation. In February 2026, ten months after approval, the Citizens' Voice still described the conversion as planned. That same month, Gjoklaj was in front of the zoning board again, this time for the 13-unit Parsons building.

In practice, approvals turn into apartments one building at a time, and each building's schedule depends on its own financing and construction. If you add up every approved unit in the table, you are adding up approvals. Units with tenants in them will come later.

Demand Has Been Growing Downtown

Demand downtown has grown. In February 2026, Diamond City Partnership's executive director told the Citizens' Voice that downtown Wilkes-Barre had about 25% more residents than in 2019. He also said visits for dining, shows and shopping had recovered to 85% of pre-pandemic levels, while visits by downtown office workers had reached 67% in 2025. He pointed to Wilkes University and King's College as part of downtown's mix. That helps explain 87 N. Main St., where the 10 approved apartments are aimed at students, in two- and three-bedroom layouts.

So more people are living downtown, and new apartments are arriving in small batches at prices close to the regional benchmark. That combination supports demand for renovated units at middle-market rents.

What This Means If You're Buying a 2–4 Unit

If you plan to rent an older two-family near HUD's benchmark, a converted church or factory proposed at a similar rent is part of your competition. The conversion has new systems, new finishes and sometimes leased garage parking. The Phoenix Building, for example, has a lease with the city parking authority for spaces in the garage at 30 N. Main St. The older building's advantage is its cost. If you buy a two- or three-family at a price that works at benchmark rent, you aren't carrying $47,000 per unit of renovation debt that has to be recovered through rent.

That should shape your underwriting. Budget rents near the HUD figures for your unit sizes, not at the top of the 116 S. Main range. Put money into what renovated competitors offer, such as updated kitchens, parking and finishes, before spending on extras they don't have. Also consider location within the city. Most of this pipeline sits in or next to downtown, on North Main, South Main, East Union and East Northampton. Parsons, where Matson Avenue is, is the main exception. If you're buying a block or two from one of these addresses, check your rent assumptions against what that specific building will offer once it opens. Our Wilkes-Barre house hacking guide covers the owner-occupied side, and our Scranton multifamily numbers guide uses an underwriting framework that also works for Wilkes-Barre.

Quick Answers

Are these conversions luxury apartments? Not according to the proposed rents. The Phoenix Building's January 2026 proposal of $1,200 to $1,500 sits close to HUD's FY2027 two-bedroom figure of $1,363 for the Scranton–Wilkes-Barre metro.

How many units are in the pipeline? The approved conversions in the table above add up to 81 units. The Marx Sheet Metal factory would add 27 more, for 108. The 120-unit plan at 63 S. Main St. is larger than all of those combined.

Which section of the city has the most activity? Downtown and its edges along North and South Main, with Parsons as the other active spot.

If you're weighing a Wilkes-Barre duplex or triplex against these new units, Luxe Homes Real Estate can run the deal analysis at benchmark rents, weigh it against the conversions planned nearby, and handle leasing and property management once you own it. Schedule an Investment or Property Consultation and bring the address.